Converting a Three-Wheeler Cargo Fleet to LiFePO4
Three-wheeler cargo fleets running dense last-mile distribution usually start from petrol or lead-acid traction, where energy cost per delivery kilometre is hard to forecast, roadside refuelling eats into every shift, and heavy payloads in stop-start traffic place sustained load on the drivetrain. This scenario sets out the traction configuration we quote for that duty cycle: Origin Drive Future LiFePO4 packs with depot charging, output derated rather than cut off at low state of charge, sized to the vehicle controller envelope and mounting bay.
Illustrative application scenario, based on the requirements we quote for. It does not represent a named customer or a completed reference project.

E-Mobility · Three-wheeler cargo

What this site limits
- Cargo duty draws higher continuous current than passenger use: thermal design is set by the hill-and-load case, not the flat-road one
- The pack has to fit the existing cargo box aperture and mounting rails
- Chassis, controller and charging arrangements are fixed by the operator, so the pack adapts to the vehicle rather than the reverse
- Route length and payload differ between drivers, so sizing uses the loaded worst case
- Vehicles are in revenue service, so conversion happens inside planned downtime windows
The challenge
Our solution



What this configuration supports
Typical configuration
The open question for a three-wheeler cargo fleet is whether the vehicle can complete a full shift with a full commercial payload on board. That is the duty cycle the pack has to be specified around.
— The design requirement we specify three-wheeler traction packs around
How the order is executed
The terms below apply to the batteries and hardware in this configuration. Voltage, capacity, quantity and destination are written into the quotation, and the items below are confirmed in writing before production.
| Minimum order | 20 units per model for a production order. Single units are available as paid evaluation samples, credited against your first production order. |
| Lead time | 25 days after the deposit is received for a standard batch. Tooling, custom BMS or project-specific capacity is scheduled separately and confirmed on the quotation. |
| Payment | T/T: 30% deposit with the order, balance against the bill of lading copy. |
| Shipment | Tell us the destination port or door. The quotation states the Incoterm and the freight option we are quoting, so the delivered cost is comparable across suppliers. |
| Packing | Packed to the packing instruction applying to UN3480 or UN3481, terminals protected, lithium battery mark and hazard label applied, pallets strapped and shrink-wrapped. |
| Documents with the goods | Packing list, commercial invoice, MSDS, UN38.3 test summary and report, shipper’s declaration for dangerous goods, and the bill of lading or air waybill. |
| Per unit | Datasheet for your model and the end-of-line test record for that serial number. |
| Warranty | 3–5 years, depending on model, written into the contract. |
| HS classification | Lithium-ion accumulators, heading 8507.60. The national tariff line and duty rate are confirmed against your destination before the order is placed. |
Documents: Packing and shipping document checklist · provided with your quotation · BMS protocol mapping note · provided with your quotation
How to verify before ordering
- Evaluation packs run on the actual loaded route, comparing energy per trip before and after conversion
- Capacity tolerance and cycle data from the sorting and test records
- Mounting drawing and connector list checked against one converted vehicle before the batch is built
- UN38.3 test summary report and transport documents
- Quotation naming pack voltage, capacity, enclosure, connector and warranty terms
Models that fit this scenario
Every figure in these tables is published on the matching product page. Voltage, capacity, enclosure and connector can be re-rated for your project.
E-Motorcycle & E-Scooter Batteries
| Application / load | Voltage platform & capacity | Current & thermal design | BMS & communication |
|---|---|---|---|
| City commuter e-scooters and delivery mopeds | 60 V 20 Ah scooter pack · 64 V (60 V class), 20 Ah, 1.28 kWh | Charge current 20 A, full charge in about 1.5 hours; IP67 ABS/PC shell on aluminium frame | Over-current and short-circuit protection; UART / RS485, CAN optional |
| High-speed electric motorcycles | 72 V 20 Ah motorcycle pack · 76.8 V (72 V class), 20 Ah, 1.54 kWh | Charge current 20 A, full charge in about 1.5 hours; IP67, anti-vibration mounts | Over-current and short-circuit protection; CAN / RS485 / UART |
| Three-wheelers, e-rickshaws and passenger trikes | 60 V 32 Ah three-wheeler pack · 64 V (60 V class), 32 Ah, 2.05 kWh | Charge current 32 A, full charge in about 2 hours; IP67 powder-coated steel tray | Over-current and short-circuit protection; UART / RS485, CAN optional |
Battery Swapping Packs
| Application / load | Voltage platform & capacity | Current & thermal design | BMS & communication |
|---|---|---|---|
| Delivery three-wheelers and light cargo carts on battery-exchange networks | 48 V 24 Ah swappable pack · 51.2 V (48 V class), 24 Ah, 1.23 kWh | Maximum continuous charge current 25 A; IP67; -20 °C to +60 °C | Cell-level monitoring with active balancing; CAN / RS485 / UART, Bluetooth optional |
| Electric motorcycles and ride-hailing fleets that swap packs mid-shift | 60 V 40 Ah swap pack · 64 V (60 V class), 40 Ah, 2.56 kWh | Charge current 40 A, full charge in about 2 hours; IP67 aluminium case | Active balancing and current limiting; CAN / RS485 / UART, Bluetooth optional |
| Heavy-duty and long-route fleets that need the largest pack in the line | 72 V 45 Ah heavy-duty pack · 76.8 V (72 V class), 45 Ah, 3.46 kWh | Charge current 45 A, full charge in about 2.5 hours; IP67, shock-absorbing mounts | Active balancing and current limiting; CAN / RS485 / UART, Bluetooth optional |
Have a similar project?
Tell us your site, load and volume and we will come back with a configuration and price.