Commercial and Industrial Peak Shaving Solution

Home / Solutions / Commercial and Industrial Peak Shaving Solution
Containerised and cabinet BESS for tariff arbitrage, demand charge reduction and load-shedding resilience.

Commercial and Industrial Peak Shaving Solution

Commercial and industrial electricity users face two separate cost problems: the energy tariff, which rewards shifting consumption to off-peak hours, and the demand charge, which penalises the highest fifteen- or thirty-minute int…

Commercial and Industrial Peak Shaving Solution
Overview

Commercial and Industrial Peak Shaving Solution

Commercial and industrial electricity users face two separate cost problems: the energy tariff, which rewards shifting consumption to off-peak hours, and the demand charge, which penalises the highest fifteen- or thirty-minute interval of the month. A battery energy storage system addresses both by charging when power is cheap and discharging when it is expensive or when site load peaks. In markets with unstable supply, the same system also covers short outages and protects production lines from interruption. Origin Drive Future supplies cabinet and containerised BESS from 100 kWh to 500 kWh with integrated PCS, BMS and energy management, quoted per project on load data and tariff structure.
Commercial and Industrial Peak Shaving Solution
Site conditions

What a commercial or industrial site looks like

Peak shaving and load-shedding resilience are decided by metered data, not by installed capacity. The load shape, the tariff structure and the number of high-demand intervals per month set the size of the system.

  • Factories, cold stores, mills, workshops and commercial buildings with a monthly demand charge or a hard supply limit
  • Interval meter data available for at least a year, including the worst months
  • Limited yard or indoor space, and a switch room that may not be adjacent to the battery location
  • Grids that are stable enough to plan around, but where a supply interruption stops production outright
Constraints

What the design has to respect

  • Battery power rating sized on the site’s load peaks, not on average consumption
  • Two functions reconciled at design stage: tariff arbitrage and backup duty have different power and energy requirements
  • Layout that respects cable routes, earthing and the clearance the installation actually needs
  • Protection coordination with the site’s existing switchgear, agreed before the configuration is fixed
  • A cabinet or container form factor that suits the space you actually have
Part 01

Tariff Arbitrage and Demand Charge Reduction

Two value streams usually justify a C and I battery: the spread between peak and off-peak energy prices, and the reduction of monthly maximum demand.

  • Charge during off-peak or valley tariff windows, discharge during peak windows, once or twice per day
  • Peak-shaving logic that trims site load above a configurable threshold rather than following a fixed schedule
  • Typical daily cycling of one to two cycles, aligned with the site’s operating hours
  • Demand-limiting setpoint configured per month and adjusted seasonally
  • Energy management controller that can run arbitrage, peak shaving or a blended strategy

We provide the load-data template we use for sizing, so the business case is built on the site’s own interval meter data rather than generic assumptions. Battery power rating is sized on the site’s load peaks rather than on average consumption, because the value of the system is concentrated in a small number of high-demand intervals each month.

Part 02

Load-Shedding Resilience and Backup Function

In markets with weak or unreliable grids, stability is a first-order concern rather than a secondary benefit. A storage system designed only for arbitrage is often unsuited to backup duty, so the two functions must be reconciled at design stage.

  • Automatic transfer to backup mode on grid loss, with defined transition time and protected load circuits
  • Reserve state-of-charge floor held back for outage coverage instead of being sold into the peak window
  • Protected-load design so refrigeration, servers or critical process equipment stay energised while non-essential loads drop
  • Sizing based on the longest expected outage and the critical load, not the whole site load
  • Optional diesel or solar integration as a second layer where outages are long and frequent

Where backup and arbitrage share the same battery, we document the reserve policy explicitly so daily dispatch does not erode outage autonomy.

Part 03

System Integration and Safety

C and I installations sit inside working facilities, so safety engineering and physical integration matter as much as energy capacity.

  • All-in-one cabinet or containerised designs with integrated PCS, BMS, HVAC and fire suppression provisions
  • Multi-level protection: cell monitoring, pack fuses, contactor control, insulation monitoring and arc detection options
  • Thermal management by forced-air or liquid cooling depending on climate and duty cycle
  • Grid-code and anti-islanding functions configured per destination market
  • Parallel expansion of multiple units to reach larger capacities without replacing installed equipment

We supply layout drawings, cable schedules, earthing recommendations and commissioning procedures, and we can review your site’s single-line diagram before finalising the configuration. Where site space is limited, cabinet units can be installed indoors against a wall with defined clearance, while containerised units suit yards and loading areas with road access for delivery and servicing.

Benefits

What this design gives you

Two Revenue Streams

Energy arbitrage and demand charge reduction can be captured from the same asset, improving payback relative to a single-purpose installation and diversifying the project’s revenue base.

Production Continuity

Backup-capable configurations keep critical loads energised through grid disturbances, protecting work in progress, refrigeration and temperature-sensitive stock from spoilage, rework and unplanned restart costs that would otherwise be absorbed by the operator.

Documented Reserve Policy

Where one battery serves both arbitrage and backup, the reserve state of charge is defined in writing so outage autonomy is not quietly traded away during daily dispatch optimisation.

Sized on Real Meter Data

Sizing uses the site’s own interval load data and tariff schedule, so capacity, power rating and payback estimates reflect actual consumption patterns rather than generic industry assumptions or vendor averages.

Modular Expansion

Additional cabinets or containers can be paralleled as load grows, allowing phased investment instead of committing the full project capacity at the outset and spreading capital expenditure across budget cycles.

Project-Level Engineering Support

Single-line diagram review, layout drawings and commissioning procedures are provided so local contractors can install and test to a defined standard without factory supervision on site.

Specification

Reference specification

Rated energy capacity100 kWh / 215 kWh / 500 kWh
ChemistryLiFePO4
AC output50-250 kW, 380/400V three phase
Daily cycling1-2 cycles per day
Round-trip efficiencyApproximately 85-90% at system level
Depth of dischargeUp to 90% with reserve policy applied
Cycle life at 80% DoD4,000-6,000 cycles
Thermal managementForced air or liquid cooling
Grid interfaceGrid-tied, with backup mode and anti-islanding
Delivery and documents

How an order runs

These are the terms we quote on for storage cabinets and containerised systems. Voltage, capacity, quantity and destination are fixed on the quotation, and every figure below is confirmed in writing before production starts.

Minimum order20 units per model for a production order. Single units are available as paid evaluation samples, credited against your first production order.
Lead time25 days after the deposit is received for a standard batch. Tooling, custom BMS or project-specific capacity is scheduled separately and confirmed on the quotation.
PaymentT/T: 30% deposit with the order, balance against the bill of lading copy.
ShipmentTell us the destination port or door. The quotation states the Incoterm and the freight option we are quoting, so the delivered cost is comparable across suppliers.
PackingPacked to the packing instruction applying to UN3480 or UN3481, terminals protected, lithium battery mark and hazard label applied, pallets strapped and shrink-wrapped.
Documents with the goodsPacking list, commercial invoice, MSDS, UN38.3 test summary and report, shipper’s declaration for dangerous goods, and the bill of lading or air waybill.
Per unitDatasheet for your model and the end-of-line test record for that serial number.
Warranty3–5 years, depending on model, written into the contract.
HS classificationLithium-ion accumulators, heading 8507.60. The national tariff line and duty rate are confirmed against your destination before the order is placed.

Documents: Packing and shipping document checklist · provided with your quotation · BMS protocol mapping note · provided with your quotation

Verification

How to verify before you commit

The business case and the hardware are checked against your own meter data.

  • The load-data template we use for sizing, so the model runs on your interval data rather than on generic assumptions
  • Layout drawings, cable schedules, earthing recommendations and protection coordination notes
  • A review of your single-line diagram before the configuration is finalised
  • UN38.3 test summary and report, plus transport documentation for the delivered configuration
  • Commissioning procedures and, where backup duty is included, a test sequence that proves the transfer
Selection matrix

Models that fit this scenario

Every figure in these tables is published on the matching product page. Voltage, capacity, enclosure and connector can be re-rated for your project.

Commercial & Industrial Energy Storage

Application / loadVoltage platform & capacityCurrent & thermal designBMS & communication
Factories, telecom sites and commercial buildings on peak shaving and demand charge management100 kWh / 50 kW cabinet · battery-only DC cabinet, 51.2 V DC bus (16S), paired with an external 50 kW PCS or DC-coupled PV inverter0.5C continuous charge and discharge; forced-air cooling; IP54; DC round-trip efficiency 88%-90%Three-level BMU / BCU / BAU protection with aerosol fire suppression; CAN / RS485 / Ethernet (Modbus TCP for EMS and SCADA)
Industrial parks and mini-grids with a 10-foot footprint215 kWh liquid-cooled container · 768 V DC bus (240S), 100 kW0.5C continuous; liquid cooling holding cell temperature difference below 3 °C; IP54; 89%-91%Perfluorohexanone or aerosol suppression with gas, smoke and temperature detection; CAN / RS485 / Ethernet, IEC 61850 optional
Large parks and grid-side projects needing battery and PCS in one enclosure500 kWh / 250 kW container · 1331.2 V DC bus (416S), 250 kW PCS and EMS integrated in a 20-foot container0.5C continuous; liquid cooling with redundant circulation pumps; IP54; 89%-91%Grid-tied, off-grid or diesel generator support; CAN / RS485 / Ethernet, IEC 61850 optional; explosion-proof pressure relief

Send twelve months of interval meter data and your tariff schedule, and we will prepare a sizing and dispatch proposal.

FAQ

Buyer FAQ

These answers match the sitewide terms and the quality page. Where a quotation differs, the quotation governs.

What is the minimum order quantity?

MOQ is 20 units per model. Single units are available as paid evaluation samples, and that cost is credited against your first production order.

What is the lead time?

Standard configurations ship 25 days after the deposit clears. Custom ratings, custom enclosures or multi-model orders carry the delivery date written into the quotation.

How do I pay?

Payment is by T/T. The deposit and balance proportions are written into the quotation before anything is produced.

Which standards and certificates apply?

Target standards are UN38.3, IEC 62619, CE and RoHS. LVD / EMC conformity is held under UDEM certificate M.2026.206.C143410, valid until 2031-06-29 and covering YD-24-314, YD-48-314 and YD-80-340. The certificate status that applies to your model is confirmed in writing with the quotation.

Certification table on the quality page

What documents ship with the goods?

Packing list, invoice, MSDS, UN38.3 summary report, dangerous goods declaration and the bill of lading, plus the datasheet and the factory inspection record for each unit. Packaging follows UN3480 / UN3481 and HS code 8507.60 applies. The port of loading is confirmed at quotation.

How long is the warranty?

Warranty is 3 to 5 years depending on the model and the duty cycle; energy storage models can be extended to 8 years. The term that applies is written into the quotation.

Where do the cells come from?

Cells are purchased directly from EVE Energy, Gotion High-tech and CALB. We state the purchase fact only, and we do not rank or recommend any supplier.

Can the battery be customised?

Voltage platform, capacity, enclosure and connectors can be re-rated per project, and the final configuration is written into the quotation. Drawings or a sample pack help us confirm fitment before tooling.