Portable Power Stations
Typical lead time for this line: 25 days after deposit · MOQ 20 units per model (single units available as paid samples) · Payment by T/T · Port of loading and unit datasheet confirmed at quotation.
Selection matrix
The table below lists the models in this line against the vehicle or load they are built for, the voltage platform and capacity, the current and thermal design, and the BMS and communication that ships with them, with the same figures as the matching product page.
| Application / load | Voltage platform & capacity | Current & thermal design | BMS & communication |
|---|---|---|---|
| Site cabins, field work and emergency backup where a generator is not practical | 220 V portable power station · 300 Wh, 1.4 kWh, 1.5 kWh and 4 kWh standard; larger capacities customised per project | 220 V AC output; charging current adjustable from 2 A to 50 A; -20 °C to +60 °C; no fuel, no exhaust and no generator noise | Recharged from mains or solar; portable configurations quoted per project |
Typical lead time for this line: 25 days after deposit · MOQ 20 units per model (single units available as paid samples) · Payment by T/T · Port of loading and unit datasheet confirmed at quotation.
Buyer FAQ
These answers match the sitewide terms and the quality page. Where a quotation differs, the quotation governs.
What is the minimum order quantity?
MOQ is 20 units per model. Single units are available as paid evaluation samples, and that cost is credited against your first production order.
What is the lead time?
Standard configurations ship 25 days after the deposit clears. Custom ratings, custom enclosures or multi-model orders carry the delivery date written into the quotation.
How do I pay?
Payment is by T/T. The deposit and balance proportions are written into the quotation before anything is produced.
Which standards and certificates apply?
Target standards are UN38.3, IEC 62619, CE and RoHS. LVD / EMC conformity is held under UDEM certificate M.2026.206.C143410, valid until 2031-06-29 and covering YD-24-314, YD-48-314 and YD-80-340. The certificate status that applies to your model is confirmed in writing with the quotation.
What documents ship with the goods?
Packing list, invoice, MSDS, UN38.3 summary report, dangerous goods declaration and the bill of lading, plus the datasheet and the factory inspection record for each unit. Packaging follows UN3480 / UN3481 and HS code 8507.60 applies. The port of loading is confirmed at quotation.
How long is the warranty?
Warranty is 3 to 5 years depending on the model and the duty cycle; energy storage models can be extended to 8 years. The term that applies is written into the quotation.
Where do the cells come from?
Cells are purchased directly from EVE Energy, Gotion High-tech and CALB. We state the purchase fact only, and we do not rank or recommend any supplier.
Can the battery be customised?
Voltage platform, capacity, enclosure and connectors can be re-rated per project, and the final configuration is written into the quotation. Drawings or a sample pack help us confirm fitment before tooling.
Showing the single result
-
220V Portable Power Station (0.3-4 kWh)
YD-PP- Battery TypeLiFePO4 (LFP)
- Available Capacities300 Wh / 1.4 kWh / 1.5 kWh / 4 kWh
- Larger CapacitiesCustomised per project
View details →

