Home / Quality & certifications
Quality & compliance

Tested before it ships, documented when it does

Every EcoDyny pack is built to a written specification, tested on the line, and shipped with the certification and test documents your customs broker and safety authority will ask for.

Process

Seven control points

Incoming cell control

Capacity, internal resistance, voltage and appearance sampled per batch; out-of-tolerance cells are rejected before they reach a welding station.

In-process checks

Weld pull tests, BMS parameter verification, insulation resistance and torque checks recorded against the unit serial number.

Aging

Each pack is cycled on an aging rack to catch early cell or BMS failures before packing.

End-of-line test

Capacity, internal resistance, charge/discharge curve, communication and protection trip points verified and logged.

Abuse testing

Overcharge, forced discharge, external short, nail penetration, crush and thermal shock on representative samples.

AQL inspection

Finished goods inspected on an AQL basis for workmanship, labelling and packaging integrity.

UN38.3 packing

Air-shipment packaging, MSDS and test summary issued with every consignment.

Certifications

What we certify

Standards and the evidence we can supply against each.

('Standard', 'Scope', 'Evidence')
UN38.3Lithium battery transportTest summary and report for every model
IEC 62133-2Secondary cells and batteriesType test report
IEC 62619Industrial battery safetyType test report
IEC 62620Industrial battery performanceCapacity and cycle data
CEEU market accessDeclaration of conformity
RoHSRestricted substancesTest report
ISO 9001Quality management systemCertificate
MSDSChemical safety dataPer model, in your shipping language
Equipment

Test equipment

Environmental chambers

−40°C to +85°C thermal shock and high-temperature storage.

Cycle life rigs

Continuous charge/discharge to 1,000+ cycles with capacity retention logging.

Abuse test bench

Overcharge, forced discharge, short circuit, nail penetration and crush.

Vibration & shock

Road-simulation vibration profiles for vehicle-mounted packs.

BMS test station

Protection trip points, communication protocols and balancing verification.

Aging racks

Batch aging before end-of-line release.

Ready to discuss your project?

Send us your application, target market and annual volume. We reply with a technical proposal and quotation within 48 hours.

Scroll to Top
WARFQ